Beebe Lake Dredging, Summer 2000

In the summer of 2000, the Cornell Plantations dredged Beebe Lake to remove a silt barrier which had formed at the entrance the lake (just west of the stone bridge).

John and Pat Clark (JPC) and Kristin Poduska and Erika Merschrod (KPEM) took photos of the dredging process and the dredged lake.

More equipment at work in Beebe Lake (JPC)